Close

Horticulture

Overall Reports of Lawngtlai Horticulture Division :
SI No. Name Designation
1 C. Lianluaia DHO
2 Hunlawmawma ADHO
3 R. Lalmuanpuii HEO
4 Laldintluangi Circle  Officer,Lawngtlai
5 Subash Chakma Circle  Officer,Chawngte
6 F. Liannuaia Circle  Officer,Sangau
7 N. Vanlalhluna Circle  Officer,Diltlang
8 Chhanmangcheua Sr. Horticulture Demonstrator
9 Lalchhuanmawia Horticulture Demonstrator
10 Phing-uh Horticulture Demonstrator
11 S. Vanlalthanga Horticulture Demonstrator
12 M. Sangkunga Horticulture Demonstrator
13 Hmangaihropuia Horticulture Demonstrator
14 H. Lalrawngbawla Horticulture Demonstrator
15 LM. Hranglung Horticulture Demonstrator
16 Vanlalhriatpuia H/D (MR)
17 Lalremruatfela H/D (MR)
18 K. Lalmuankimi UDC
19 Laldampuii LDC
20 C. Lalrinpuii LDC
21 Thangchungnunga Driver 
22 MK. Khailey Peon
23 H. Lalfamkima Peon (MR)
24 Walter LR. Kulhmawia DHC (Contract)
25 Lalhriatpuia Pachuau DHC (Contract)
26 R. Lallianzuala DEO  (Contract)

A thil tum:

Horticulture Department chuan   theirah, thlai hnah, hmarcha,  vaimim leh pangpar chin te leh enkawlte a huam a ni.kum sawm liamta ah khan India Sawrkar hmalakpuina in bul tan a ni. Horticulture hmasawnna 100 a 50 hi a hlawkna tel tu ten an tum a, 100 a 50 dang leh hi India Sawrkarin a tum thung a ni. Tin, hmalakna hrang hrangte he ruahmanna hnuaiah hian kum tam tak lo kal pui tawh a ni. Horticulture Department-in a tum bul pui ber chu kuthnathawk mi te eizawnna tih ngel ngheta hlawk zawka an thlai te an hralh chhuah theih nana hmalak leh thlai thar kawngah hma an sawn a, rannung leh thlai tawih thei lakah te venhimna lam zirtir a chak tak a hmalak a ni.

Hmalakna kal mek:

place

human

  1. AES of M.Orange:
    • Fund allotted Rs. 6,00,000/-
    • Project covered areas : 30 Hac.
    • Thingkah, Bungtlang ‘S’, Hmunnuam
  2.  AES of other fruit crops :
    • Fund allotted Rs. 1,80,000/-
    • Project covered areas : 10 Hac.
    • Barapansury * Kubalovasora
  3. Rejuvenation of Senile Orchard :
    • Fund allotted : Rs. 2,31,115.2/-home
    • Project covered areas : 30 Hac.
    • Pangkhua , Sangau , Thingkah
  4. Hybrid Off-Season Cabbage (MIDH) :
    • Fund allotted : Rs. 4,75,650/-
    • Project covered areas : 34 Hac.
    • Lungpher ‘S’, Lungzarhtum ,  Bualpui ‘Ng’,
    • Ngengpuikai, Diltlang,  Hmunnuam.
  5. Hybrid Off-Season Tomato (MIDH) :
    • Fund allotted : Rs. 2,03,850/-
    • Project covered areas : 15 Hac.
    • Lawngtlai * Sangau * Diltlang * M. Kawnpuivillage
    • Nghalimlui * Kamalanagar-III
  6. Creation of Water Source :
    • Individual Water Tank : 35 Units allotted.
    • Amount Rs. 45,000/unit.
  7. Protected Cultivation :                                                                                 
    • Green House (Pre-fabricated)
    • Green House (Installation)
    • Allotment is not yet received from Directorate of Horticulture.